-
Desire to acquire a LPL
Base TN11:
Scrounge -1
Cash layout -3
final TN7
Rolled 10 acquired, arriving May 22
-
Norbotten lance will attempt to acquire an ER-PPC in an onipod.
7/1
Base TN10 -1 Logistics Admin - 2 +20% overall spend.
450K cbills TN7 rolls 7 will arrive July 22nd.
-
Norrbotten Lance will roll to acquire the following: 8/30
90 ton LT Base TN9 -1 logi admin -3 Scrounge roll 4
90 ton LA Base TN9 -1 logi admin -3 Scrounge roll 10 acquired
90 ton UAA Base TN9 -1 logi admin -3 Scrounge roll 10 acquired 9000
90 ton LAA Base TN9 -1 logi admin -3 Scrounge roll 10 acquired 9000
ER Large Laser Base TN11 -1 Logi admin -3 scrounge 9 acquired 200,000
1x DHS - Base TN11 -1 Logi admin -3 scrounge 7 acquired 6000
2x AC2s Base TN 9 -1 Logi -3 Scrounge rolled 10 6 acquired 150000
2X LRM15 Ammo base TN9 -1 Logi admin -3 Scrounge TN 11 7 60000
C3 Slave - Base TN11 -1 Logi admin -3 scrounge 4 failed
CASE Base TN11 -1 Logi admin -3 scrounge tn7 rolled 10 acquired 50000
90 ton RL TN9 -1 Logi admin -3 Scrounge TN5 11 acquired
90 ton LLA TN9 -1 Logi admin -3 Scrounge TN5 11 acquired 13500
90 ton UAA TN9 -1 Logi admin -3 Scrounge TN5 10 acquired 7500
90 ton foot TN9 -1 Logi admin -3 Scrounge TN5 11 acquired 10800
Total:
Arriving 10/20
Parts acquisitions Sept 1, arriving 9/22
90 ton left torso TN9 -1 Logi -3 scrounge TN5 rolled 10 acquired
C3 Slave - Base TN11 -1 Logi admin -3 scrounge TN7 7 acquired
10 tons ferro fibrous armor TN10 -1 Logi -3 TN6 8 acquired
70 ton left torso Base TN9 - -1 Logi Admin -3 Scrounge TN5 10 acquired
70 ton right leg Base TN9 - -1 Logi Admin -3 Scrounge TN5 8 acquired
70 ton ULA 8 acquired
70 ton LLA TN5 rolled 6 acquired
70 ton foot TN5 10 acquired
DHS x3 TN11 -1 Logi -3 TN7 7 5 10 2x acquired
MPL TN11 -1 Logi -3 TN7 SSRM2 rolled 11 acquired
SSRM2 SAme above acquired on 7
small laser TN 5 rolled 6
1x DHS TN 7 10 acquired 6000
LRM15 7 acquired 175000
-
Norrbotten Lance will roll to acquire the following: 8/30
90 ton LT Base TN9 -1 logi admin -3 Scrounge roll 4
90 ton LA Base TN9 -1 logi admin -3 Scrounge roll 10 acquired 21600
90 ton UAA Base TN9 -1 logi admin -3 Scrounge roll 10 acquired 9000
90 ton LAA Base TN9 -1 logi admin -3 Scrounge roll 10 acquired 9000
ER Large Laser Base TN11 -1 Logi admin -3 scrounge 9 acquired 200,000
1x DHS - Base TN11 -1 Logi admin -3 scrounge 7 acquired 6000
2x AC2s Base TN 9 -1 Logi -3 Scrounge rolled 10 6 acquired 150000
2X LRM15 Ammo base TN9 -1 Logi admin -3 Scrounge TN 11 7 60000
C3 Slave - Base TN11 -1 Logi admin -3 scrounge 4 failed
CASE Base TN11 -1 Logi admin -3 scrounge tn7 rolled 10 acquired 50000
90 ton RL TN9 -1 Logi admin -3 Scrounge TN5 11 acquired 21600
90 ton LLA TN9 -1 Logi admin -3 Scrounge TN5 11 acquired 13500
90 ton UAA TN9 -1 Logi admin -3 Scrounge TN5 10 acquired 7500
90 ton foot TN9 -1 Logi admin -3 Scrounge TN5 11 acquired 10800
Total:
Arriving 10/20
Parts acquisitions Sept 1, arriving 9/22
90 ton left torso TN9 -1 Logi -3 scrounge TN5 rolled 10 acquired 21600
C3 Slave - Base TN11 -1 Logi admin -3 scrounge TN7 7 acquired 250000
10 tons ferro fibrous armor TN10 -1 Logi -3 TN6 8 acquired 200000
70 ton left torso Base TN9 - -1 Logi Admin -3 Scrounge TN5 10 acquired 16800
70 ton right leg Base TN9 - -1 Logi Admin -3 Scrounge TN5 8 acquired 16800
70 ton ULA 8 acquired 10500
70 ton LLA TN5 rolled 6 acquired 5600
70 ton foot TN5 10 acquired 8400
DHS x3 TN11 -1 Logi -3 TN7 7 5 10 2x acquired 12000
MPL TN11 -1 Logi -3 TN7 SSRM2 rolled 11 acquired 60000
SSRM2 SAme above acquired on 7 15000
small laser TN 5 rolled 6 11250
1x DHS TN 7 10 acquired 6000
LRM15 7 acquired 175000
-
10/1 Acquisition rolls
Logi Admin Assigned
30 tons STD ARM
Base TN8, -1 Scrounge -1 Logi TN6
6 100,000
5 Fail
6 100,000
65 ton Right torso
Base TN9 -1 Scrounge -1 Logi TN7
2
9 15600
2x Flamer
Base TN9 -1 Scrounge -1 Logi TN7
10 7500
9 7500
Double Heat Sinks x4
Base TN10 -1 Scrounge -1 Logi admin -2 +20% TN6
6000 + 1200 each
8 7200
10 7200
10 7200
11 7200
CASE x2
Base TN10 -1 Scrounge -1 Logi Admin -2 +20% TN
50,000 + 10000
3 fail 10000
12 acquired 60000
AMS System
Base TN10 -1 Scrounge -1 Logi Admin -3 +30% TN5
100,000 + 30,000
5 acquired.
Arriving 10/22
-
11/1 acquisition rolls
18 rolls for November 6xWIL
Acquiring 65ton JJ x4
Base TN9 - 1 Elite Logi Admin -1 Scrounge -3 +30% spend per jet
16250 + 4875
TN4
8
4
6
5
84500 on JJs
Spending to acquire 3 small pulse lasers
Base TN11 - 1 Elite Logi Admin -1 Scrounge -3 +30% spend per SPL
TN 6
11
7
8
62,400CB
2x SRM6
Base TN9 - 1 Elite Logi Admin -1 Scrounge -3 +30% spend per SRM6
12
9
208K Cbills spent
8 Medium Pulse Lasers
Base TN11 - 1 Elite Logi Admin -1 Scrounge -3 +30% spend per MPL TN6
60,000 + 20,000
10
7
6
9
4 - nope
8
8
4 - nope
520,000
2 DHS in Omnipod
Base TN11 - 1 Elite Logi Admin -1 Scrounge -3 +30% spend per DHS TN6
7500 + 2250
8
9
19500
Arriving 11/22
894,400CB Spent
-
December 1 Purchase
4x 90 ton JJ 22,500 EA
Base TN9 -1 Scrounge -1 Logi Admin -2 20% Bonus TM5
12
7
5
10
22,500 CB
SRM6 Ammo x2
Base TN9 - 1 Scrounge -1 Logi Admin TN7
27,000 CB each
6
11
-
Additional 12/1 purchasing -
90 ton sections
Base TN9 -1 LOGI agmin -1 Scrounge -2 20% overage TN5
1 EA
LA 4 21600
LT 10 21,600
RA 6 21,600
RT 8 21,600
RL 7 21,600
LL 3 21,600
25,920 in overages
86,400 in sections
60 ton sections
Base TN9 -1 LOGI agmin -1 Scrounge -2 20% overage TN5
14,400 EA + 28800
LA 8
LT 8
RT 6
RA 9
LL 8
RL 8
103,680
DEC purchases complete.
-
Purchases 24 March, arriving 4/15
Purchasing 65 ton sections for Tbolt
Base TN9 - Scrounge -1 Logi admin -0 -1 Ubiquitous -1 Location Difficulty +2 20% spreading cash +2
15,600 EA + 4680 bonus
LA 12
LT 9
RT 10
RA 8
LL 4
RL 11
CB 28080 Bonuses + 76000
106080
90 ton actuator set x2
Base TN9 -1 Scrounge -0 Logi Admin -3 +30% +2 difficulty for region
TN7
UAA 2700 + 9000 7 and 6
LAA 1350+ 4500 10 and 7
ULA 4050 +13,500 7 and 6
LLA 1890+ 7200 2 and 6
FT 3240 + 10,800 7 and 7
CB 84510
2x Gauss Ammo
Base TN11 -1 Scrounge +2 Difficulty -7 +70% Scrounge TN5
28000 Scrounge
4 7
48000 total
238,590
-
4/13 Warehouse
Norbotten requisitions the following.
all TNs Base 9 +2 LOC -1 Scrounge -1 Admin -2 +20% OA Final TN7
1x 50 ton Left leg 12,000 + 2400 4 fail
1x 50 ton ULA 7500 + 1500 12 pass
1x 50Ton LLA 4000 + 800 9 pass
1x 50ton foot 6000 + 1200 4 fail
2x AC10 Ammo 6000 + 1200 EA
4 fail
8 pass
3 SHS 2000 + 400 EA
9 pass
6 fail
7 pass
9500 + 31,000 = 40,500
4/14
1x 50 ton Left leg 12,000 + 2400 9 pass
2x 50ton foot 6000 + 1200 3 and 4 fail fail
1x AC10 ammo 6000 + 1200 8 pass
2x SHS 2000 + 400 4 and 8
5600 + 20,000 = 25,600
4/15
2x 50ton foot 6000 + 1200 10 and 6 pass fail
10 tons armor
Base TN8 -1 Scrounge -1 LOG +2 Contract Base TN8
11 pass
100,000
Total
All parts arrive May 4th
-
4/30
Norbotten Sells UAC5 + 1T ammo
Rolled 2d6 : 3, 2, total 5
-
5/6
Norbotten sells HBK-4H Hunchback
Base price 3,419,875
Rolled 2d6 : 2, 4, total 6
-
1,709,937 added to warehouse.
-
5/1/58
Norbotten will attempt to purchase the following at +80% over value
1 ton Gauss ammo
Base TN 11 + 2 Contract - 8 -1 Scrounge tn4
4 acquired
1 ton LBX10/Cluster Ammo
6 acquired
20,000 EA + outlay = 82,000
6x standard medium lasers in Omnipods
Base TN 11 -1 Scrounge +2 Contract -7 + 70% overpay TN5
Arriving on 5/22
50,000 + 15,000
5
6
5
9
6
325,000
4x DHS in Omnipods
Base TN11 -1 Scrouge +2 Contract -10 double paying TN2
11
8
9
12
57,600 Cbills
464,000 total
-
6/25
90 ton Upper arm Actuator:
Base TN10 -2 -2 +2 20% T6 8 acquired.
10,800
80 ton axe
Base TN10 -2 Scrounge -2 +20% TN6 11 passed
36,000
10 tons of armor
Base TN8 -2 Scrounge TN6 7 acquired.
100,000
80 ton TSM
Base TN10 -2 Scrounge -1 +10% (128K) TN7 12 complete.
1,408,000
Parts arrive June 15.
June 1st parts
55 ton LA Ubiquitous
Base TN10 - 2 Scrounge -2 Ubiquitous Final 6 6 pass
13,200
55 ton LA Ubiquitous
Base TN10 - 2 Scrounge -2 Ubiquitous Final 6 11 pass
13,200
55 ton ubiquitous RL
Base TN10 - 2 Scrounge -2 Ubiquitous Final 6 5 fail
55 ton ubiquitous RL
Base TN10 - 2 Scrounge -2 Ubiquitous Final 6 11 pass
13,200
55 ton ubiquitous RT
Base TN10 - 2 Scrounge -2 Ubiquitous Final 6 10 pass
13,200
55 ton Ubiquitous Jump Jet
Base TN10 - 2 Scrounge -2 Ubiquitous Final 6 7 pass
Base TN10 - 2 Scrounge -2 Ubiquitous Final 6 5 fail
Base TN10 - 2 Scrounge -2 Ubiquitous Final 6 8 pass
22,000 total
PPC
Base TN9 -2 Scroung -2 +20% TN6 7 acquired
200,000
LRM10
Base TN9 -2 Scroung -2 +20% TN6 3 failed
Base TN9 -2 Scroung -2 +20% TN6 11 acquired
140,000 total
LRM10 Ammo
Base TN9 -2 Scroung -2 +20% TN6 9 passes
Base TN9 -2 Scroung -2 +20% TN6 7 passes
42,000
55 ton actuators - ubiquitous
Base TN9 -2 Scrounge -2 Ubiquitous TN5
ULA 9
LLA 11
Foot 8
44,500 all acutators
-
July 1st
Selling GRF-1N Griffin
4,924107 Cbills /2
Negotiation Roll
Rolled 2d6 : 2, 3, total 5
-
2,462,053 added to warehouse.
-
July 1st Norrbotten attempts to purchase the following supplies:
Omnipod Guardian ECM
250K base
Spending extra 50% (125K) for -5
Base TN11 - 2 Scrounge -5 TN4
9 acquired
375K
60 tons of standard armor
Base TN8 - 2 Scrounge TN6
12
5
9
12
11
8
50 tons acquired, 500K
-
Norbotten staff retention
CHA 6
Alice Hunter 28 TN6 rolled 11 + 3
Hatomi Nilsson 28 TN6 rolled 9 +3
Candace Kent 32 TN7 rolled 5 + 3 9
Gerard Perrin 32 TN7 rolled 4 + 3 7
Brendan Ashford 42 TN8 rolled 5 + 3
Mechanics:
Andrei Vasliveski 35 TN 7 7 +3
Rachel Jiu 25 TN6 5 + 3
Jazmyn Hartnell 33 TN7 6 +3
Christel Nichols 25 TN6 11 +3
Jack MacKenzie 299 TN6 10 +3
Doctor:
John Dalton 32 TN7 8 +3
-
end of Fusilier purchasing.
80t LA TSM 131200 +50%
Base TN11 (-2 Scrounge -5 50%) TN5
6 acquired
80 ton TSM RL
Base TN11 (-2 Scrounge -5 50%) TN5
5 acquired
10 tons ferro fibrous armor
Base TN11 -2 Scrounge -5 50%) TN5
7 acquired.
LRM20 w/A4
11 -2 Scrounge -5 50% TN5 8 acquired
Medium Pulse Laser
11 -2 Scrounge -5 50% TN5 4 nope
11 -2 Scrounge -5 50% TN5 11 acquired
set of 80 ton acutators
ULA
LLA
HND
80tn RT
Base TN8 - 2 Scrounge - 9 acquired
80tn LA
Base TN8 - 2 Scrounge - 4 nope
Base TN8 - 2 Scrounge - 7 acquired
it'll show up when it shows up.
-
Purchasing on St Ives.
2x Omni-podded Gauss Rifles + 50%
Base TN 11 -2 Scrounge -5 50% TN4
5
7
LBX10 Omnipodded + 50%
Base TN 11 -2 Scrounge -5 50% TN4 9 acquired
4 tons of cluster ammo
7
4
9
4
1x podded CASE system
Base TN 11 -2 Scrounge -5 50% TN4 8 acquired
80 ton hatchet
Base TN9 - -2 Scrounge -2 +20% TN5 7 acquired.
80 ton TSM system
Base TN11 -2 Scrounge -5 50% TN4 4 acquired
90 ton podded LLA
Base TN11 -2 Scrounge -5 50% TN4 6 acquired
90 ton podded HND
Base TN11 -2 Scrounge -5 50% TN4 12 acquired
On the FedCom Factory planet:
Omnipodded C3M
Base TN11 -2 Scrounge - -50% TN4
10
4x Omnipodded C3S
Base TN11 -2 Scrounge - -50% TN4
6
7
5
12
Regular C3S
Base TN11 -2 Scrounge - -50% TN4 7 acquired
-
while in transit to operation:
Elite Tech Jack McKenzie will customize the Spartan Kenton
Class B
Removing ML
Adding C3s
Base TN5 (+1 CUS +3 B class -2 FAC -3 QT) 2160 min TN4
Rolled 2d6 : 6, 2, total 8
-
8/11
55 ton Ubiquitous Right Torso, 13,200
Base TN9 +2 contract type, -2 Scrounge -5 (+50%) 19800 TN4 9 acquired
95 ton Right Torso Right Torso, 22800 -5 (+50%) 34,200
Base TN9 +2 contract type, -2 Scrounge -5 (+50%) TN5 6 acquired
95 ton Lower Arm Actuator, 2750 -5 +50% TN5 7 acquired.
55 ton Ubiquitous Jump Jet x2 (11,000) -5 (+50%) 16,500 tn 4 10, 10 acquired
100 lower arm actuator. Base TN 9+2 = 22 -2 Scrounge -5 +50% TN5 4 fails 2500
100 lower arm actuator. Base TN 9+2 = 22 -2 Scrounge -5 +50% TN5 8 passes 7500
single heat sink Base TN9+2-2-5 TN5 2500 8
single heat sink Base TN9+2-2-5 TN5 2500 11
Omnipodded gauss rifle, 375,000
Base TN11 + 2 Mission type -2 Scrounge - 8 +80% 675,000 TN3 4 acquired.
Arrived 9/4 ish?
-
9/12
Selling Wolverine 7K, Atlas 7K
Wolverine - 4,966,179
Rolled 2d6 : 4, 6, total 10
Atlas - 11,237,000
Rolled 2d6 : 1, 1, total 2
-
16,948,106 added to warehouse.
-
11/13 -sell Grand Dragon C - Crippled
1,365,488
Rolled 2d6 : 1, 1, total 2
-
11/13 -sell Grand Dragon C - Crippled
1,365,488
(https://cincybattletech.com/Themes/core/images/dice_warn.gif) This dice roll has been tampered with!
Rolled 2d6 : 1, 1, total 2
Thats about right for a CT and hipped out leg.
-
11/24/3050 After Contracts
Purchasing 90 tons of armor
Base TN8 (-2 Scrounge -2 +20%) 100K + 20K Each
200,000 Expenditure
Final TN4
10
9
5
9
5
5
9
7
6
1,080,000 Expediture for Armor
Small Laser x2
Base TN9 (-2 SCR -2 +20%) TN5 6 pased
11250 + 20
13500
8 passed
2 Small pulse lasers
Base TN11 (-2 SCR -7 +70%)
TN2
4
3
81,600
Acquired
3 regular medium lasers
Base tn9 (-2 SCR -2 +20%) 40,000 + 20% 48,000
TN5
5, 6, 8
Acquired.
144,000
Parts arrive 12/15
12/1 parts requisition.
45 ton jump jets x2 (can't get MekHQ to load for pricing)
Base TN9 (-2 SCR -2 +20%) TN5
11
12
6 tons of LBX20 Cluster
Base TN11 (-2 SCR -6 +60%) TN3
11
5
3
5
8
8
8 tons of gauss ammo
Base TN11 (-2 SCR -6 60%) TN3
3
6
9
4
11
7
11
8
Arriving
-
18 June 3060:
Norbotten will sell the three salvaged mechs from the solo as the sheets are missing. All 3 are crippled
Stalker 5S 2,420,216
Rolled 2d6 : 1, 6, total 7
Excalibur 2Rb 2,441,608
Rolled 2d6 : 5, 1, total 6
Shadow Hawk 5m 1,544,528
Rolled 2d6 : 4, 6, total 10
-
6638031 cbills added to balance sheet.
-
Norbotten Dr Healing checks
Smif has 6 wounds., the major injury loss was made already.
Week 1:
Rolled 2d6 : 4, 2, total 6
Week 2:
Rolled 2d6 : 3, 5, total 8
Week 3
Rolled 2d6 : 5, 4, total 9
Week 4
Rolled 2d6 : 2, 4, total 6
Week 5
Rolled 2d6 : 5, 5, total 10
Week 6
Rolled 2d6 : 2, 4, total 6
-
Major Smif returns to service without too much extra added shrapnel to the brainpan
-
2 august 3060
Norbotten sells wrecked corpse of Highlander 732B
1370622 added to warehouseRolled 2d6 : 1, 1, total 2
-
2 august 3060
Norbotten sells wrecked corpse of Highlander 732B
1370622 added to warehouse(https://cincybattletech.com/Themes/core/images/dice_warn.gif) This dice roll has been tampered with!
Rolled 2d6 : 1, 1, total 2
'
yeah that tracks.