accidental double armor repair attempt in same time frame, guess one of them had an extra long coffee break and just didn't tell anyone, whatever, the armor got replaced, thats all that matters.
BTW times can be assumed to be done top down in terms of what the order is, per tech, as it were.
From Sep 26 310 minutes into the day
Sonoma Jones Reg
Install New RT in Crab 27 7,+4,-2,-3,-1 TN5
960 min
install Gauss Rifle GallowGlas RA 7, +1,-2,-3 TN 3
480 min
1440
Zdeno Pavlik "Reg" Clan Tech KNowlegde
Repair Crab RT Structure up to 3/4 7,+2,-2,-3,-1 TN3
720 min
Replace 21 armor Banshee LA, 7,-1,-2,-1 TN3
Rolled 2d6 : 6, 2, total 8
420 min
Replace 22 Armor Crab20 LL 7,-1,-2,0,-1 TN3
Rolled 2d6 : 4, 2, total 6
220min
Replace 8 armor Crab20 CT 7,-1,-2,0,-1 TN3
Rolled 2d6 : 1, 6, total 7
80 min
1440
William Moore Vet
repair up to 1/2 structure CRAB 27 HD 6,+1,-2,-1,-1 TN 3
Rolled 2d6 : 3, 3, total 6
270 min
Replace Banshee CT 34 Armor 6,-1,-2,0 TN3
Rolled 2d6 : 2, 5, total 7
340 min
Replace Banshee RT 19 armor 6,-1,-2,0 TN3
Rolled 2d6 : 5, 2, total 7
190 min
repair up to 1/4 structure CRAB 27 LA 6,0,-2,-1,-1 TN2
Rolled 2d6 : 4, 4, total 8
180 min
repair up to 1/4 structure CRAB 27 LL 6,0,-2,-1,-1 TN 2
Rolled 2d6 : 6, 1, total 7
180 min
repair up to 1/4 structure CRAB 27 LT 6,0,-2,-1,-1 TN 2
Rolled 2d6 : 6, 5, total 11
180 min
replace Crab 20 RA 10 armor 6,-1,-2,0,-1 TN2
Rolled 2d6 : 6, 1, total 7
100 min
1440 min
Artie Geerlof "Vet" Clan Tech Knowledge
Replace Crab 20 RT 14 Armor 6,-1,-2,0,-1 TN2
Rolled 2d6 : 6, 3, total 9
140min
Replace Crab 20 LA 14 Armor 6,-1,-2,0,-1 TN2
Rolled 2d6 : 6, 2, total 8
140min
replace 22 armor Banshee RL 6,-1,-2,-1 TN2
Rolled 2d6 : 1, 1, total 2
440 min
Replace Crab 20 LT rear 5 Armor 6,-1,-2,0,-1 TN2
Rolled 2d6 : 6, 4, total 10
50min
770 min, chill out for a while until Sonoma is done...
On Sep 28, 310 minutes into the day, if the Crab 27 torso install fails for Sonoma Jones, Artie will begin his attempt bare in mind this is a hypothetical attempt, and may not count for XP if it happens to roll a twelve but Sonoma succeeds.
Install New RT in Crab 27 6,+4,-2,-3,-1 TN4
960 min
to finish on Sep 30, 310 minutes into the day.