Starting 5-5-45
Repair of Orion, done in factory. Because of Admin/HR each tech has 510 min a day for work.
Assigned tech: Regular Mech tech Denise Kim
Replace Head Triple time 600 min TN 4
Rolled 2d6 : 1, 4, total 5
Replace Cockpit Time 120 min TN 4
Rolled 2d6 : 5, 1, total 6
Replace Armor Head 9 pts 135 min TN 2
Rolled 2d6 : 2, 5, total 7
Replace Armor LA 9 pts135 min TN2
Rolled 2d6 : 4, 4, total 8
Replace Armor LT 20 pts 300 min TN 2
Rolled 2d6 : 4, 3, total 7
Replace Armor LT(R) 2 pts 30 min TN 2
Rolled 2d6 : 4, 5, total 9
Replace Armor CT 7 pts 105 min TN 2
Rolled 2d6 : 5, 1, total 6
Replace Armor RA 2 pts 30 min TN 2
Rolled 2d6 : 2, 4, total 6
Total time 1455 min/ 510=2.833 days
Repair of Crusader, done in factory. Because of Admin/HR each tech has 510 min a day for work.
Assigned Tech: Veteran Tech Grace Sarbans
Fix <50% Internal Structure LA 5 pts 135 min TN 3
Rolled 2d6 : 6, 6, total 12
Fix < 75% internal Structure LT 11 pts 180 min TN 4
Rolled 2d6 : 5, 1, total 6
Fix < 75 % Internal Structure LL 9 pts 180 min TN 4
Rolled 2d6 : 4, 3, total 7
Fix 100% Internal Structure RT 12 pts 270 min TN 5
Rolled 2d6 : 3, 5, total 8
Fix 100% Internal Structure RL 11 pts 270 min TN 5
Rolled 2d6 : 6, 3, total 9
Replace RA 180 min TN 4
Rolled 2d6 : 5, 6, total 11
Replace Actuator Upper RA 90 Min TN 2
Rolled 2d6 : 4, 1, total 5
Replace Actuator Lower RA 90 Min TN 2
Rolled 2d6 : 2, 2, total 4
Replace Actuator Hand RA 90 Min TN 2
Rolled 2d6 : 3, 1, total 4
Replace Armor RA 20 pts 300 min TN 2
Rolled 2d6 : 5, 3, total 8
Replace Armor LA 20 pts 300 min TN 2
Rolled 2d6 : 4, 2, total 6
Replace Armor LT 24 pts 360 min TN 2
Rolled 2d6 : 3, 1, total 4
Replace Armor RT 24 pts 360 min TN 2
Rolled 2d6 : 1, 3, total 4
Replace Armor LT(R) 5 pts 75 min TN 2
Rolled 2d6 : 4, 3, total 7
Replace Armor RT(R) 6 pts 90 min TN 2
Rolled 2d6 : 3, 4, total 7
Replace Armor CT(R) 2 pts 30 min TN 2
Rolled 2d6 : 5, 4, total 9
Replace Armor H 9 pts 135 min TN 2
Rolled 2d6 : 6, 1, total 7
Total Time 2715 min/510=5.324 days
Customizations done in factory. Because of Admin/HR each tech has 510 min a day for work.
Shadow hawk SHD-2H
Tech assigned: Veteran Tech Barbara Chewbowski
Remove 12 SHS, LRM 5, and LRM 5 ammo. Time 2640min/510=5.176 days TN 4
Rolled 2d6 : 2, 4, total 6
Install 11 DHS (10 engine, 1 RT), PPC RA, JJ RT, JJ LT, and MED Laser LA. Time 5880/510=11.529 days TN 6
Rolled 2d6 : 5, 2, total 7
Total time=16.705 days